Case Study | Retail Flooring project for Lightning Source UK Ltd
Welcome to Fasttrack flooring
Home
About Us
Recent Projects
Free Survey & Report
Contact Us


Midlands Regional Office 01952 461600
North West Regional Office 07536 067762
Case Study Carrier Transicold in Oldham, Manchester. Refurbishment project.
Carrier Transicold in Oldham, Manchester. Refurbishment project.

Carrier Transicold specialise is in the servicing, repair and installation of refrigeration units for vehicles in the food industry. The client had a new power float finished floor and was suffering from slip hazards caused by wet vehicles rolling in and out of the industrial unit.

Fastrack fully prepared the floor area using captive shot-blasting, this itself created a textured finish to the floor. Fastrack then applied a base coat of water based coating to seal the floor, this was then followed by a coating of a high build epoxy with an added polymer bead to give an anti-slip and seamless finish.

Carrier Transicold Project:
 
Home | About Us | Recent Projects | Free Survey & Report | Case Studies | Site Map
All Rights reserved: Fastrack Flooring Ltd, 2008
Retail Flooring ContractorsCase | Fastrack are specialists in retail, shop, stores industrial flooring.
website design & website promotion, SEO, by THISWORKS www.thisworks.co.uk